Well now, let’s talk about this grid thingy, what you need to make it work, you know? It’s like gettin’ ready to plant corn, gotta have the right stuff, or it ain’t gonna grow.
First off, you gotta have a good computer, that’s for sure. A real strong one. They say somethin’ like an “Intel Core i3-2130,” sounds fancy, huh? But if you wanna make it run real good, like a well-fed mule, you best get somethin’ stronger, like an “Intel Core i5-8600K.” Don’t ask me what all them numbers mean, just get the bigger one, that’s what I say.
Then, you need space, lots of it. Like a big ol’ barn for all your hay. They say you need at least 100 GB, that’s Gigabytes, whatever them are. Just make sure you got a big space, otherwise, it ain’t gonna fit, simple as that.
- Strong Computer Brain (CPU): Minimum Intel Core i3-2130, better with Intel Core i5-8600K.
- Lots of Room (Disk Space): At least 100 GB, more is always better.
Now, for the pictures, gotta have a good “graphics card.” Sounds complicated, but it’s like havin’ good eyesight, gotta see things clear. They say an “NVIDIA GeForce GT 640” at least, but again, bigger is better, I reckon. Makes the pictures look real nice, like a sunny day on the farm.
And if you’re foolin’ with that Oracle stuff, well, that’s a whole different kettle of fish. They got their own rules, you know? Like plantin’ beans different than corn. They got these “checklists,” long lists of things you gotta do and things you gotta have. Makes my head spin just thinkin’ about it.
They talk about “server configurations” and “operating systems” and all sorts of jibber jabber. Sounds like a bunch of hooey to me, but I guess it’s important if you’re doin’ that Oracle thing. They say you gotta have the right “users” and “groups” and make sure your “hardware” is up to snuff. Sounds like makin’ sure your tractor is tuned up before you plow the field.
They keep sayin’ “checklists” this and “checklists” that. I reckon it’s like havin’ a recipe for a good cake, gotta follow all the steps or it’ll be a mess. They got checklists for the “network” and checklists for the “installation” and checklists for just about everything, it seems.
And then there’s this other grid, the one with the sun, you know, like them solar panels folks are puttin’ up on their roofs? Well, for that, you need a “permit,” like gettin’ a license to fish. Gotta go to the town hall and get the papers signed, otherwise, they might come and make you take it all down. And you gotta make sure you got all the right parts, just like havin’ all the right parts for a wagon wheel.
So, whether it’s this computer grid or that sun grid or that Oracle grid, sounds like you gotta be prepared. Gotta have the right stuff and you gotta follow the rules. Just like farmin’, you know? Do it right, and you’ll have a good harvest. Do it wrong, and you’ll end up with a whole lotta nothin’ but weeds.
So there you have it, a little bit about what you need for these grid things. Not as simple as plantin’ potatoes, that’s for sure, but if you take your time and do it right, you might just get somethin’ good outta it.
Tags: [Grid System, Requirements, CPU, Disk Space, Graphics Card, Oracle, Server Configuration, Operating System, Checklist, Solar Grid, Permit]